DEPOTDashboardStorehouse workspace
OperationalSettings

Risk Register

Shortages, single remaining spares, lead-time exposure, and shared spare concentration.

RiskEquipmentSpareSeverityCoverage Impact
Critical dependency unavailableVacuum PumpVacuum Seal KitCriticalUncovered. Critical spare unavailable.
Single remaining spareChiller 01, Chiller 02Compressor Service KitHighOne kit protects two chillers with a 42 day supplier recovery window.
Lead-time exposureGeneratorControl ModuleHighOne spare exists, but replacement recovery is 56 days.
Shared dependency concentrationExtractor A, Extractor B, Vacuum Pump, Feed PumpBearing Set 6205HighThree available sets support four rotating assets.
Below reorder pointExtractor A, Extractor B, Feed PumpService Gasket KitHighOne kit remains against a reorder point of two.
Short-horizon consumable exposureVacuum PumpFilter ElementHighOne element remains below reorder point.
Issue Impact Warnings

Issue: 780 L Diesel

Critical commitment impact detected.

Guardrail StateCritical Commitment Impact
ImpactCritical
Affected Equipment100kVA Generator
SpareGenerator fuel position
Physical Stock410 L
Reserved Stock300 L
Available Stock110 L
Issued Quantity780 L
Projected Available-670 L
Commitment SignalsCommitment Consumption, Commitment Impact, Critical Commitment Impact
SeverityCritical
Replacement DifficultyLocal
Coverage MovementCovered -> Covered
OperatorOperator placeholder

This issue consumes inventory currently committed to Emergency Critical Spares. Projected available stock is -670 L.

Issue: 1 Control Module CM-12

Critical commitment impact detected.

Guardrail StateCritical Commitment Impact
ImpactCritical
Affected EquipmentGenerator
SpareControl Module
Physical Stock2 EA
Reserved Stock2 EA
Available Stock-1 EA
Issued Quantity1 EA
Projected Available-2 EA
Commitment SignalsCommitment Consumption, Commitment Impact, Critical Commitment Impact, Multiple Commitment Impact
SeverityCritical
Replacement DifficultySole Source
Coverage MovementAt Risk -> Uncovered
OperatorOperator placeholder

This issue consumes inventory currently committed to Emergency Critical Spares, Generator Upgrade. Projected available stock is -2 EA. This issue reduces available stock for a sole-source dependency with High uncertainty; current lead time 8 weeks recovery uncertainty.

Issue: 2 Bearing Sets

Commitment impact detected.

Guardrail StateCommitment Impact
ImpactCritical
Affected EquipmentExtractor A, Extractor B, Vacuum Pump, Feed Pump
SpareBearings
Physical Stock3 Sets
Reserved Stock1 Sets
Available Stock2 Sets
Issued Quantity2 Sets
Projected Available0 Sets
Commitment SignalsCommitment Impact
SeverityCritical
Replacement DifficultySole Source
Coverage MovementCovered -> At Risk
OperatorOperator placeholder

This issue reduces available inventory supporting Extraction Systems. Projected available stock is 0 Sets. This issue reduces available stock for a sole-source dependency with High uncertainty; current lead time 3 weeks recovery uncertainty.

Issue: 1 Vacuum Pump Seal Kit

Critical exposure detected.

Guardrail StateCritical Exposure
ImpactCritical
Affected EquipmentVacuum Pump
SpareVacuum Seal Kit
Physical Stock2 Kits
Reserved Stock0 Kits
Available Stock0 Kits
Issued Quantity1 Kits
Projected Available-1 Kits
Commitment SignalsNone
SeverityCritical
Replacement DifficultySole Source
Coverage MovementAt Risk -> Uncovered
OperatorOperator placeholder

Vacuum Seal Kit projects to -1 Kits available because the issue quantity exceeds available stock. Depot records this as Critical impact context. This issue reduces available stock for a sole-source dependency with High uncertainty; current lead time 7 weeks recovery uncertainty.

Issue: 1 Mechanical Seal Kit

Commitment impact detected.

Guardrail StateCommitment Impact
ImpactCritical
Affected EquipmentExtractor A, Extractor B, Feed Pump
SpareSeal Kit
Physical Stock3 Kits
Reserved Stock1 Kits
Available Stock1 Kits
Issued Quantity1 Kits
Projected Available0 Kits
Commitment SignalsCommitment Impact
SeverityCritical
Replacement DifficultySole Source
Coverage MovementAt Risk -> At Risk
OperatorOperator placeholder

This issue reduces available inventory supporting Extractor A. Projected available stock is 0 Kits. This issue reduces available stock for a sole-source dependency with High uncertainty; current lead time 4 weeks recovery uncertainty.

Issue: 0 Filter Bags

No material impact detected.

Guardrail StateNo Material Impact
ImpactInfo
Affected EquipmentExtractor A, Extractor B
SpareFilter Bag
Physical Stock18 EA
Reserved Stock0 EA
Available Stock18 EA
Issued Quantity0 EA
Projected Available18 EA
Commitment SignalsNone
SeverityInfo
Replacement DifficultyRegional
Coverage MovementCovered -> Covered
OperatorOperator placeholder

Linked coverage remains healthy after issue. Projected available stock is 18 EA against reorder point 12 EA.

Issue: 3 O-Ring Sets

No material impact detected.

Guardrail StateNo Material Impact
ImpactInfo
Affected EquipmentAir Compressor
SpareO-Ring Set
Physical Stock5 Kits
Reserved Stock0 Kits
Available Stock5 Kits
Issued Quantity3 Kits
Projected Available2 Kits
Commitment SignalsNone
SeverityInfo
Replacement DifficultyRegional
Coverage MovementCovered -> Covered
OperatorOperator placeholder

Advisory dependency coverage remains stable. Projected available stock is 2 Kits.

Issue: 2 Cleaning Sanitizer

Critical exposure detected.

Guardrail StateCritical Exposure
ImpactCritical
Affected EquipmentNo equipment affected.
SpareNo linked equipment dependency
Physical Stock40 L
Reserved Stock0 L
Available Stock0 L
Issued Quantity2 L
Projected Available-2 L
Commitment SignalsNone
SeverityCritical
Replacement DifficultyLocal
Coverage MovementCovered -> Covered
OperatorOperator placeholder

No linked equipment dependency projects to -2 L available because the issue quantity exceeds available stock. Depot records this as Critical impact context.

Issue: 1 O-Ring Set

No material impact detected.

Guardrail StateNo Material Impact
ImpactInfo
Affected EquipmentAir Compressor
SpareO-Ring Set
Physical Stock5 Kits
Reserved Stock0 Kits
Available Stock5 Kits
Issued Quantity1 Kits
Projected Available4 Kits
Commitment SignalsNone
SeverityInfo
Replacement DifficultyRegional
Coverage MovementCovered -> Covered
OperatorOperator placeholder

Advisory dependency coverage remains stable. Projected available stock is 4 Kits.

Issue: 0 Vacuum Pump Seal Kits

Critical exposure detected.

Guardrail StateCritical Exposure
ImpactCritical
Affected EquipmentVacuum Pump
SpareVacuum Seal Kit
Physical Stock2 Kits
Reserved Stock0 Kits
Available Stock0 Kits
Issued Quantity0 Kits
Projected Available0 Kits
Commitment SignalsNone
SeverityCritical
Replacement DifficultySole Source
Coverage MovementUncovered -> Uncovered
OperatorOperator placeholder

Vacuum Pump moves to Uncovered because Vacuum Seal Kit projects to 0 Kits available. This issue reduces available stock for a sole-source dependency with High uncertainty; current lead time 7 weeks recovery uncertainty.

Issue: 2 Air Intake Filters

Commitment impact detected.

Guardrail StateCommitment Impact
ImpactWarning
Affected EquipmentAir Compressor
SpareAir Intake Filter
Physical Stock6 EA
Reserved Stock2 EA
Available Stock4 EA
Issued Quantity2 EA
Projected Available2 EA
Commitment SignalsCommitment Impact
SeverityWarning
Replacement DifficultyRegional
Coverage MovementCovered -> Covered
OperatorOperator placeholder

This issue reduces available inventory supporting Emergency Critical Spares. Projected available stock is 2 EA. Recovery difficulty is Regional with 1-3 weeks typical recovery.

Issue: 3 Refrigerant Filters

This issue reduces equipment coverage.

Guardrail StateCoverage Reduction
ImpactWarning
Affected EquipmentChiller 01, Chiller 02
SpareRefrigerant Filter
Physical Stock4 EA
Reserved Stock0 EA
Available Stock4 EA
Issued Quantity3 EA
Projected Available1 EA
Commitment SignalsNone
SeverityWarning
Replacement DifficultyRegional
Coverage MovementCovered -> At Risk
OperatorOperator placeholder

Chiller 01, Chiller 02 changes from Covered to At Risk. Projected available stock is 1 EA. Recovery difficulty is Regional with 1-3 weeks typical recovery.

Issue: 1 Service Gasket Kit

Critical commitment impact detected.

Guardrail StateCritical Commitment Impact
ImpactCritical
Affected EquipmentExtractor A, Extractor B, Feed Pump
SpareGasket Kit
Physical Stock2 Kits
Reserved Stock1 Kits
Available Stock0 Kits
Issued Quantity1 Kits
Projected Available-1 Kits
Commitment SignalsCommitment Consumption, Commitment Impact, Critical Commitment Impact
SeverityCritical
Replacement DifficultyImported
Coverage MovementAt Risk -> At Risk
OperatorOperator placeholder

This issue consumes inventory currently committed to Extraction Systems. Projected available stock is -1 Kits. This issue reduces available stock for an imported dependency with 4-20 weeks recovery profile.

Shared Spare Risk
Inventory ItemEquipment SupportedCritical EquipmentSpare CriticalityAvailable StockUnavailableReadinessReplacement DifficultyCoverage StatusSeverityExposure
Bearing Set 6205Extractor A, Extractor B, Vacuum Pump, Feed PumpExtractor A, Extractor B, Vacuum PumpCritical2 Sets0 SetsWatchSole SourceAt RiskHighShared dependency pressure across 4 assets.
Service Gasket KitExtractor A, Extractor B, Feed PumpExtractor A, Extractor BImportant0 Kits1 KitsBlockedImportedUncoveredCriticalNo available stock after active allocations for at least one linked dependency.
Mechanical Seal Kit MS-40Extractor A, Extractor B, Feed PumpExtractor A, Extractor BCritical1 Kits1 KitsAt RiskSole SourceAt RiskHighShared dependency pressure across 3 assets.
O-Ring Set OR-18Chiller 01, Chiller 02, Air CompressorNoneImportant5 Kits0 KitsReadyRegionalCoveredMediumStock position supports current dependency coverage.
Compressor Service Kit CSK-01Chiller 01, Chiller 02NoneCritical1 Kits0 KitsAt RiskSole SourceAt RiskHighAvailable stock is at or below reorder point after active allocations.
Air Intake Filter AF-10Generator, Air CompressorGeneratorImportant4 EA0 EAWatchRegionalAt RiskHighAvailable stock is at or below reorder point after active allocations.
Filter Bag FB-100Extractor A, Extractor BExtractor A, Extractor BImportant18 EA0 EAReadyRegionalCoveredMediumStock position supports current dependency coverage.
Refrigerant Filter RF-20Chiller 01, Chiller 02NoneImportant4 EA0 EAReadyRegionalCoveredLowStock position supports current dependency coverage.
Coverage Change Report
PeriodEquipmentSpareCoverage MovementReason
2026-03Vacuum PumpVacuum Seal KitAt Risk -> UncoveredSeal kit stock moved to zero after stores issue.
2026-04GeneratorControl ModuleCovered -> At RiskSupplier recovery moved to 56 days.
2026-05Chiller 01Compressor Service KitCovered -> At RiskShared kit stock dropped below reorder point.
2026-06Feed PumpBearing Set 6205Covered -> At RiskShared dependency pressure increased to four assets.