Technical Compatibility Layer
Use Equipment Architecture to check UPS, VFD, motor, breaker, sensor, PLC, and control hardware requests before approval.
Open equipment to see compatible spares, coverage, lead-time exposure, readiness, and verification signals derived from inventory sources.
Open the engineering definition layer for electrical architecture, controls, required specifications, documents, and procurement compatibility.
Use Equipment Architecture to check UPS, VFD, motor, breaker, sensor, PLC, and control hardware requests before approval.
Open the engineering specification register for PT100s, gaskets, gauges, PRVs, VFDs, UPSs, fittings, seals, and other installed components.
Search, filter, and open an asset to see inventory supportability detail.
Click equipment to answer: if this fails today, are we covered from available inventory?
| Asset | Compatible Spares | Coverage | Risk | Lead Time Exposure | Readiness | Verification |
|---|---|---|---|---|---|---|
| 4 spares | At Risk | Coverage Risk | Gasket Kit - 35 days | No - required spare is not usable on site. | No Open Check | |
| 4 spares | At Risk | Coverage Risk | Gasket Kit - 35 days | No - required spare is not usable on site. | No Open Check | |
| 3 spares | At Risk | Coverage Risk | Compressor Service Kit - 42 days | Constrained - coverage is thin or shared. | No Open Check | |
| 3 spares | At Risk | Coverage Risk | Compressor Service Kit - 42 days | Constrained - coverage is thin or shared. | No Open Check | |
| 3 spares | Uncovered | Uncovered Support | Control Module - 56 days | No - critical equipment has no usable spare coverage. | No Open Check | |
| 3 spares | Uncovered | Uncovered Support | Vacuum Seal Kit - 45 days | No - critical equipment has no usable spare coverage. | No Open Check | |
| 3 spares | At Risk | Coverage Risk | Gasket Kit - 35 days | No - required spare is not usable on site. | No Open Check | |
| 2 spares | At Risk | Coverage Risk | O-Ring Set - 21 days | Yes - spare available on site. | No Open Check |