Engineering Assets
Installed physical engineering component instances that connect equipment, engineering specifications, definitive installation locations, lifecycle ownership, relationships, and documents.
Installed RealityNot InventoryNot Maintenance
Installed Engineering Configuration
Engineering Assets represent real physical component instances. They establish installed configuration without maintenance history, work orders, inspections, calibration, validation, QA workflows, PM scheduling, or execution tracking.
Engineering Assets Register
Installed physical Engineering Component instances by equipment, location, manufacturer, serial number, and lifecycle status.
| Engineering Asset | Component | Equipment | Location | Status | Serial | Installed |
|---|---|---|---|---|---|---|
PT100 Product Temperature ProbePT100 | Crystallizer | Bottom Temperature Port | Installed | EH-482928 | 14 Feb 2026 | |
PT100 Product Temperature ProbePT100 | Nutsche Filter Dryer | Filter Plate Temperature Port | Installed | WIKA-NFD-5821 | 22 Jan 2026 | |
Pressure Gauge 0-10 barGauge | Nutsche Filter Dryer | Top Sight Glass | Installed | PG-NFD-4410 | 11 Nov 2025 | |
Pressure Gauge 0-10 barGauge | RO System | Outlet Pressure | Installed | PG-RO-8821 | 03 Dec 2025 | |
Vacuum Gauge -1 to 0 barGauge | Nutsche Filter Dryer | Vacuum Header | Installed | VG-NFD-1772 | 18 Oct 2025 | |
Vacuum Gauge -1 to 0 barGauge | EQ-VP-001 | Inlet Vacuum | Installed | VG-VP-9044 | 19 Oct 2025 | |
Pressure Relief Valve 4 barPRV | Crystallizer | Vessel Relief Port | Installed | LSR-CRY-4B-2201 | 07 Feb 2026 | |
Pressure Relief Valve 4 barPRV | Nutsche Filter Dryer | Top Head | Installed | LSR-NFD-4B-2204 | 08 Feb 2026 | |
Rupture Disc 6 barRupture Disc | Crystallizer | Emergency Vent | Installed | FIKE-AX-6620 | 09 Feb 2026 | |
2 inch PTFE Tri-Clamp GasketGasket | Nutsche Filter Dryer | Outlet Valve | Installed | LOT-PTFE-7721 | 04 Mar 2026 | |
2 inch PTFE Tri-Clamp GasketGasket | Crystallizer | Bottom Drain | Installed | LOT-PTFE-7733 | 14 Feb 2026 | |
2 inch Viton Tri-Clamp GasketGasket | EQ-VP-001 | Inlet Vacuum | Installed | LOT-FKM-1198 | 16 Jan 2026 | |
2 inch Silicone Tri-Clamp GasketGasket | RO System | Sanitary Outlet | Installed | LOT-SIL-5510 | 10 Dec 2025 | |
Sight Glass 2 inch BorosilicateSight Glass | Nutsche Filter Dryer | Top Sight Glass | Installed | SG-NFD-7110 | 20 Jan 2026 | |
Sight Glass 2 inch BorosilicateSight Glass | Crystallizer | Side Sight Glass | Installed | SG-CRY-7133 | 21 Jan 2026 | |
2 inch Tri-ClampTri-Clamp | Nutsche Filter Dryer | Outlet Assembly | Installed | TC-NFD-8841 | 04 Mar 2026 | |
2 inch Tri-ClampTri-Clamp | Crystallizer | Bottom Drain | Installed | TC-CRY-8843 | 14 Feb 2026 | |
2 inch Butterfly ValveValve | Nutsche Filter Dryer | Outlet Valve | Installed | BV-NFD-490-11 | 04 Mar 2026 | |
2 inch Butterfly ValveValve | Crystallizer | Bottom Drain | Installed | BV-CRY-490-12 | 14 Feb 2026 | |
Mechanical Seal 316L / SiCMechanical Seal | Nutsche Filter Dryer | Agitator Shaft | Installed | JC-NFD-9120 | 18 Dec 2025 | |
Mechanical Seal 316L / SiCMechanical Seal | EQ-VP-001 | Pump Shaft | Installed | JC-VP-9121 | 19 Dec 2025 | |
Bearing 6205-ZZBearing | Air Compressor | Motor NDE | Installed | SKF-6205-88 | 05 Sep 2025 | |
Bearing 6205-ZZBearing | RO System | Booster Pump | Installed | SKF-6205-91 | 07 Sep 2025 | |
ABB ACS355 VFD 4 kWVFD | Crystallizer | Agitator Drive Panel | Installed | ABB-CRY-3190 | 01 Feb 2026 | |
5 kVA Three Phase UPSUPS | Crystallizer | Control Panel UPS | Installed | UPS-CRY-2200 | 01 Feb 2026 | |
3 kW Agitator MotorMotor | Crystallizer | Agitator Shaft | Installed | MTR-CRY-108 | 01 Feb 2026 | |
Filter Mesh 100 micronFilter Mesh | Nutsche Filter Dryer | Filter Plate | Installed | FM-100-600-455 | 25 Jan 2026 | |
Sieve 500 micronSieve | Nutsche Filter Dryer | Filter Plate | Installed | SV-500-600-108 | 26 Jan 2026 | |
Siemens S7-1200 PLCPLC | Crystallizer | Electrical Panel | Installed | PLC-CRY-1214 | 01 Feb 2026 | |
Siemens KTP700 HMIHMI | Crystallizer | Operator Station | Installed | HMI-CRY-700 | 01 Feb 2026 | |
PT100 Product Temperature ProbePT100 | Distillation Unit | Vapor Temperature Port | Awaiting Installation | EH-489100 | Awaiting installation |