DEPOTDashboardStorehouse workspace
OperationalSettings
Receiving5

not released

Verification8

open checks

Inventory Risk34

Critical risks

Supplier Exposure2

Critical suppliers

Disposition4

awaiting review

Procurement11

replenishment items

Critical Spares9

at risk

Operational Risks

Items most likely to interrupt issue readiness, receiving release, or equipment support.

Released Stock12

items with released available quantity

Available
Reserved Stock11

12 active reservations

Committed
Open Verification Tasks8

open or in-review physical checks

Verify
Awaiting Disposition4

held or quarantined inventory records

Not Available
Critical Spare Risks9

high or critical spare exposures

At Risk
Supplier Exposure2 Critical

4 suppliers carry explainable inventory-to-equipment dependency exposure.

Open Supplier Failure Impact
Dead Stock4 unresolved

7 stale records; 3 strategic dormant spares are separated from obsolete or zombie stock.

Dead Stock Review
Duplicate Candidates6

5 high-confidence groups need master-data review.

Open Duplicate Detector
Reorder Actions11

open Procurement List items

Reorder
Engineering Compatibility2 Review

1 mismatches and 1 warnings before procurement approval.

Spec Review
Location Counts0

start count from Locations

Count Mode
Adjustment Requests4 active

1 inventory variances awaiting review

Review Records

Storehouse Previews

Short previews only. Open the destination page for full registers, filters, reports, or detail review.

Receiving

Most important receipts and holds.

Open Receiving
N-Heptane 99.5%

MRN-2026-000001 - QA hold pending laboratory result reference

Quarantined
Centrifuge Bag

MRN-2026-000003 - Complete receiving inspection

Under Inspection
Ethanol Drum

MRN-2026-000004 - Return evidence retained for traceability

Rejected

Verify Stock

Highest-priority physical checks.

Open Verification
Reverse Osmosis Element

RO Store - Review Census Record

Open
Electrical Connectors

Container 1 - Investigate Inventory

Open
Thread Tape

Maintenance Workshop - Investigate Inventory

Open

Procurement List

Top replenishment actions.

Open Procurement
RO Membrane

0 EA released - Stockout and long supplier lead time

Open
APC Smart UPS SRT 3000VA

Installed UPS 2.2 kVA - Crystallizer control UPS replacement request

Open
ABB ACS355 4kW VFD

Installed ABB ACS355 - Approved Crystallizer VFD replacement

Open

Engineering Compatibility

Specification checks before purchase.

Open Architecture
APC Smart UPS SRT 3000VA

Crystallizer - Requested UPS does not match Crystallizer Equipment Architecture.

Engineering Mismatch
Schneider ATV320 4kW VFD

Crystallizer - Requested VFD needs engineering review before approval.

Review Specification

Critical Spares

Highest-risk spare coverage records.

Open Critical Spares
Control Module CM-12

0 EA released - Generator

Critical
Service Gasket Kit

0 Kits released - Extractor A, Extractor B, Feed Pump

Blocked
Vacuum Pump Seal Kit VP-SK

0 Kits released - Vacuum Pump

Critical